As the leading company in the GEA Division of “Mechanical Separating Technology”, Westfalia Separator occupies a premier position in that area with more than 50 sales and service companies world-wide.
One of the largest projects carried out by Westfalia engineers with CADISON is a construction of a 110,000 t/a bio-diesel system in
“Our goal was to handle approx. 50% of all projects via CADISON – especially the larger projects where several planners are simultaneously involved in plant design. This goal has been achieved.” Achim Scholz,
Director CAD/CAE Management &
IT Services, Westfalia Separator
VPT-Kompressoren GmbH supplies industrial air and gas compressors, for offshore installations or for use in the chemical and petrochemical sectors. On three oil rigs which belong to a Romanian oil and gas company a technology solution needed to be installed to block carrier gas and derive an economic benefit from it.
“The time required for the project was reduced using CADISON because different work groups could work in parallel with one another” VPT Managing Director
Carsten Kollenbach
LTH Dresden is a specialist company in the areas of stainless steel processing and plant engineering for the foodstuffs industry. For their project Lafarm ( Greece) where the requirement was for Automatic data synchronisation of planning changes – for the engineers at LTH Dresden this was the decisive factor for choosing CADISON. They were
"The time savings are truly convincing: ”For a pro - ject worth € 3 or 4 million we need about 20 hours to put together the proposal – it used to take twice that long.“ Andreas Hiegelsberger, Project Manager Process Technology
looking for a tool that would compile all the components of a drawing into one calculation list.
The plant engineers at Oerlikon Neumag - the business unit within the segment Oerlikon Textile, the worldwide largest textile machine provider, and the market and technology leader in the range of the synthetic fiber plants – have used CADISON for more than five years. For a customer in United Arab Emirates a turnkey project was planned
With CADISON it is easy to adapt the machines and plants to the realities of customers. Important too is the compatibility to other software tools such as Solid-Works and SAP" Dipl.-Ing. Hartmut Claussen
Head of Project Management &
Mechanical Engineering
completely with CADISON - a typical combination project, in which there were three Neumag locations and one external planner were involved.
With turnover of more than 1.6 billion euros, the KSB Corporation is one of the leading suppliers of pumps, fittings and associate systems. They used CADISON for a project in Senegal where they used CADISON for planning pipeline systems and engineering of the entire water transport systems
“The combination of a planning tool based on AutoCAD enabling CAD planning while also allowing engineers to manage all CAD data in Project-Engineer proved an ideal basis for our work.” Alexander Schmitt Planner, Plant Design, KSBAG